WORK PACKAGES

WP Tasks Partners
WP1
Project Coordination and Management
Coordinator
Jochen Zschau
GFZ-Potsdam
Project Coordination and management GFZ Potsdam, AMRA, NOAGI
WP2
Real Time estimation of earthquake source parameters
Coordinator
Aldo Zollo
AMRA Naples
Task 2.1
Real-time methodologies for event detection and location
AMRA, NIEP, NOAGI , INGV, IMOR, NKUA, UC Berkeley
Task 2.2
Real-time methodologies for magnitude/moment estimates
AMRA, NIEP, UNIKARL, INGV, GFZ Potsdam, NKUA, CNRS - DR20, UC Berkeley, NTU, IMOR
Task 2.3
Near real-time processing of seismic arrays for earthquake rapid alert
NORSAR, NKUA
Task 2.4
Implementation and testing of virtual seismologist expert system
ETHZ
Task 2.5
Application of developed techniques to selected European test sites
AMRA, ETHZ, GFZ Potsdam, NIEP, NORSAR, UNIKARL, IMOR, INGV, KOERI, NKUA, CSEM/EMSC, KNMI, UC Berkeley, NTU, CNRS - DR20
WP3
Real-time
damage assessment and reduction strategies

Coordinator
Gaetano Manfredi
AMRA, Naples
Task 3.1
Real time damage scenarios
AMRA,NORSAR
Task 3.2
Induced landslides – Real time slidemap and delayed slide
NGI
Task 3.3
Applications for real-time risk reduction: algorithms, interfaces (case studies) for semi-active and active control of infrastructures
AMRA, NKUA, Selex
WP4
Real Time Shake Maps
Coordinator
Claus Milkereit
GFZ-Potsdam
Task 4.1
Implementation of on-line shake map and intensity map generation
IMOR, NKUA, KOERI, NIEP, INGV, AMRA, NOAGI, GFZ Potsdam
Task 4.2
Seismic network optimisation
UBER, UNIKARL, NIEP, KOERI, NKUA, AMRA
Task 4.3
Parameter optimisation
UNIKARL, GFZ Potsdam, IMOR, KOERI, NIEP, AMRA
Task 4.4
Development of a prototype system of low cost seismic sensors and building monitoring devices with real-time reporting and early warning capabilities
UBER, GFZ Potsdam, KOERI, NIEP
Task 4.5
Accounting for site effects in real-time loss estimations
WAPMERR, NIEP, KOERI, AMRA
Task 4.6
Implementation of the real-time shake map estimation for the megacity Cairo
NRIAG, INGV
WP5
Real-time aftershock hazard assessment
Coordinator
Stefan Wiemer
ETH Zuerich
Task 5.1
Building RAFT – the Robust Aftershock Forecasting Tool
ETHZ, IMOR, INGV
Task 5.2
Improving aftershocks hazard assessment by incorporating physical models
INGV, GFZ Potsdam, ETHZ, IMOR
Task 5.3
Integrating temporary seismic networks into the real-time aftershock hazard assessment
GFZ Potsdam, ETHZ
Task 5.4
An automated system for 3D real-time aftershocks hazard assessment in Greece
NOAGI
WP6
Dissemination of Results And End-Users Interface
Coordinator
Gerassimos Papadopoulos
NOA Athen
Task 6.1
Dissemination of results
All the partners
Task 6.2
Interface with end users
All the partners
Task 6.3
Dynamic Decision Support Module
KNMI, GFZ Potsdam
Task 6.4
Synergy with other EU funded project
All the partners