WORK PACKAGES
| WP |
Tasks |
Partners |
WP1
Project Coordination and Management
Coordinator
Jochen Zschau
GFZ-Potsdam |
Project Coordination and management |
,
,
|
WP2
Real Time estimation of earthquake source parameters
Coordinator
Aldo Zollo
AMRA Naples |
Task 2.1
Real-time methodologies for event detection and location |
,
,
, ,
,
,
|
Task 2.2
Real-time methodologies for magnitude/moment estimates |
,
,
,
,
,
,
,
,
,
|
Task 2.3
Near real-time processing of seismic arrays for earthquake rapid
alert |
,
|
Task 2.4
Implementation and testing of virtual seismologist expert system |
|
Task 2.5
Application of developed techniques to selected European test sites
|
,
,
,
,
,
,
,
,
,
,
,
,
,
,
|
WP3
Real-time
damage assessment and reduction strategies
Coordinator
Gaetano Manfredi
AMRA, Naples |
Task 3.1
Real time damage scenarios |
, |
Task 3.2
Induced landslides – Real time slidemap and delayed slide |
|
Task 3.3
Applications for real-time risk reduction: algorithms, interfaces
(case studies) for semi-active and active control of infrastructures
|
,
,
|
WP4
Real Time Shake Maps
Coordinator
Claus Milkereit
GFZ-Potsdam |
Task 4.1
Implementation of on-line shake map and intensity map generation
|
,
,
,
,
,
,
,
|
Task 4.2
Seismic network optimisation |
,
,
,
,
,
|
Task 4.3
Parameter optimisation |
,
,
,
,
,
|
Task 4.4
Development of a prototype system of low cost seismic sensors and
building monitoring devices with real-time reporting and early warning
capabilities |
,
,
,
|
Task 4.5
Accounting for site effects in real-time loss estimations |
,
,
,
|
Task 4.6
Implementation of the real-time shake map estimation for the megacity
Cairo |
,
|
WP5
Real-time aftershock hazard assessment
Coordinator
Stefan Wiemer
ETH Zuerich |
Task 5.1
Building RAFT – the Robust Aftershock Forecasting Tool |
,
,
|
Task 5.2
Improving aftershocks hazard assessment by incorporating physical
models |
,
,
,
|
Task 5.3
Integrating temporary seismic networks into the real-time aftershock
hazard assessment |
, |
Task 5.4
An automated system for 3D real-time aftershocks hazard assessment
in Greece |
|
WP6
Dissemination of Results And End-Users Interface
Coordinator
Gerassimos Papadopoulos
NOA Athen |
Task 6.1
Dissemination of results |
All the partners |
Task 6.2
Interface with end users |
All the partners |
Task 6.3
Dynamic Decision Support Module |
,
|
Task 6.4
Synergy with other EU funded project |
All the partners |
|
|